Basics Concept of Brickwork
Here are given some basic points,

Ensure to read the brickwork construction procedure provided by the client
Cement mortar ratio should be 1:6 ratio for 9-inch Brickwork and 1:4 ratio for 4& 1/2” inch brickwork.
The thickness of the mortar should not be more than 10 mm between the courses and sides of the bricks.
Ensure you are using good quality of cement and sand.
Ensure you have available all the Civil Engineering tools which are required for the construction.
 
  






Download Calculation of Bricks Excel Sheet  Free  

Link

Estimate of Materials and Labor Excel Sheet

Estimate of Materials and Labor Excel Sheet


In this excel sheet you all find about the following section
Bar Bending Schedule
List of Items in Buildings
Requirement of Material (in MKS And FPS System)
Requirement of Material and Labor (MKS)Materials may be
RCC/PCC
Burnt Brick (Cement Sand Mortor)
Plastering/Pointing
DPC
Flooring
Requirement of Material and Labor
Bar Weight (Imperial & Metric Sizes)
Labor Details
Excavation In Ordinary Soil
Excavation In Hard Soil
BB Work in Cement Mortar in Foundation and Plinth
BB work in Super Structure
R.B Work
Plastering
Pointing
Floor Topping
PCC
RCC
Shuttering
Filling/Campacting of Earth under Floor
Sand Cushion Under floor
Brick Ballast under floor
DPC
Brick laid by Mason
Brick laid by Mason in foundation
Steel Fixing
Paint Enamal
Paint Emulsion
Electrification
Item Wise Breakdown For Any Quantity
Steel Bars
Radda
 
  


Download Estimate of Materials and Labor Excel Sheet Free